R & D / Design

prototyping

Rapid Prototyping Request & Tracking System

The Challenge:

icons 08

A consumer electronics company’s prototyping lab received 300+ requests monthly via email and phone, with no centralized tracking or resource planning. This caused 40% utilization inefficiency and frustrated design teams with unclear timelines.

The Solution:

icons 10

Developed Power Apps portal for prototype requests with automated resource scheduling using Power Automate. Power BI on Fabric provided capacity planning analytics and predictive delivery dates based on historical data and current workload.

icons 09
icons 09

Result:

Lab utilization increased from 60% to 94%, average prototype delivery time reduced by 30%, and design teams gained predictable timelines with 95% on-time delivery accuracy.